Bathroom Remodel

For this remodel, our client had water damage and mold remediation. Once the mold was completely removed, we were able to go in and reconstruct the bathroom from the frame up. We installed new drywall with a designer shower, new hardware features, a new shower pan, and a new ventilation fan, increasing the protection from moisture build-up. We installed a new vanity, lighting, and a mirror to complete the style to the client’s preference. We installed the toilet and repaired tile flooring throughout.

Next
Next

Kitchen Remodel